Installation Guide

20
Step 7
BS20
Parts Needed For
Gables/Peak/Roof Frames
8061 Left Gable (1)
8060 Right Gable (1)
8438 Side Peak Frame (2)
8066 Roof Frame (4)
8435 Roof Frame (1)
STEP
1 Lift and fasten a left gable on top
of header, with lower leg under side
eave frame at corner, using screws.
Repeat Step 1 with right gable for
the opposite side of building.
2 Fasten side peak frames to the
inside top corners of gables using
two screws, top shorter leg facing
inside building. Fasten opposite ends
over siding stud at the lower hole
using a bolt and nut. Fasten top tab of
the siding studs to the lower hole in
side peak frame using screws.
3 Position roof frames under side
peak and eave frames. Be sure the
end of frame with the shortest space
between the 1st and 2nd hole is posi-
tioned at the lower side eave frames,
and fasten using screws.
4 Position roof frame in the same
manner at the middle of building and
fasten using four bolts and nuts.
NOTE
The gables are packed nested
together and might be mistaken
as one piece. Carefully separate
them before continuing.
STEP
1
Short space
between 1st
and 2nd hole
Position of
Side Peak Frame
8435
3
8060
8438
STEP
2
Side Peak Frame
Fasten at Lower Hole
8061
Right End
Door Location
8066
Fasten lower hole of
Side Peak Frame
Gable Fits Under
Side Eave Frame
8060
8061
STEP
4
8438