Installation Guide

Squaring the Building
Step 16
STEP
1
STEP
2
3
BX31
STEP
4
5
1Square the building on the
foundation and at the top, by
measuring diagonally from corner to
corner as previously done.
2Use string to check and see if the
sides and rear of building are straight,
not bowed inward or outward.
3Level the full perimeter of the oor
frame. Shim under with wood shingles
if necessary.
4Square the front of building as
previously done for base.
5Anchor front frame to concrete with
1/4" (6 mm) diameter expandable
anchor bolts or other means, where
shown.
NOTE
The 107" (271,8 cm) door opening
must be held for proper door
alignment. Measure between
the left and right track support.
STEP
STEP
Use String To Straighten
Side Before Anchoring
Measure Diagonally
For Squareness
Left Track
Support
Right Track
Support
107"
271,8 cm
107"
271,8 cm
31