Installation Guide

Finishing Materials
PM08
USE AS FINISHED FORM TO POUR CONCRETE
REINFORCING
STAKES
GRADE LEVEL
EARTH
4" Min.
10,2 cm
CONCRETE
REAR
FRONT
ES1014
FRONT
REAR
10x12, 10x13 or 10x14
Placement & Amount of Materials
SUGGESTION: Use remaining decking
material for shelving or an entry ramp.
96"
243,8 cm
FRONT
10x12
4- 4x8 1220x2440 MM SHEETS
DECK MATERIAL
Finish construction of your storage building following the assembly instructions.
Drill and fasten wood to steel
frames using dry wall screws.
96"
243,8 cm
717090311
SUGGESTED METHOD
CONCRETE ANCHOR BOLTS
1.46 CUBIC YARD 1,116 M
CONCRETE
1.64 CUBIC YARD 1,254 M
CONCRETE
56 7/16" 143,4 cm
(ES1014 ONLY)
40 3/8"
102,6 cm
57 3/8" 145,7 cm
3 FRONT
10x13, 10x14
5- 4x8 1220X2440 MM SHEETS
DECK MATERIAL
3
Select one of the suggested finishing materials. Be sure Base Kit lies flat on the ground. To prepare the earth
bed, remove sod and other organic debris, level the high spots with a flat shovel, and tamp the bed down.
LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL (5/8" 15,5 MM MINIMUM THICK-
NESS) NOTE:
Pressure Treated Lumber must not be used where it will make contact with your Arrow
Products. The properties of Pressure Treated Lumber will cause accelerated corrosion. If Pressure
Treated Lumber comes in contact with your Arrow Models your warranty will be voided.
6"x 6" 15,2x15,2 cm
REINFORCING MESH
PLASTIC MOISTURE
BARRIER
2" 5,1 cm SAND BED
4" 10,2 cm GRAVEL
BED
IMPORTANT NOTE: If leveling blocks are
required due to uneven ground conditions,
the base kit must be completely supported
along outside perimeter, because the kit is
not self supporting.
Plywood rests between floor frames on
the inside flange.
20 1/2"
52,1 cm
48"
121,9 cm
48"
121,9 cm
20 1/2"
52,1 cm
48"
121,9 cm
48"
121,9 cm