Instructions / Assembly

6
Step 7: Continued
25
25AJ
You will need for this page:
Seal the roof ridge by applying Weather
Stripping across the entire roof ridge as
shown.
5
67293
Weather
Stripping
1
(QTY: 6)
JB
Attach the Ridge Cap to the Roof using six
(6) Java Bolts and Nuts as shown. Do not
place Bolts in the end holes of the Ridge
Cap.
DO NOT fully tighten Ridge Cap
Bolts until Peak Caps are installed.
This will ease assembly.
10823
Ridge Cap
1
JB
6
10823
JB
JB
Weather Stripping Tape should be applied in
a continuous strip along the length of the roof.
Leave holes on ribs open.
5