Instructions / Assembly
6
Step 7: Continued
25
25AJ
You will need for this page:
Seal the roof ridge by applying Weather
Stripping across the entire roof ridge as
shown.
5
67293
Weather
Stripping
1
(QTY: 6)
JB
Attach the Ridge Cap to the Roof using six
(6) Java Bolts and Nuts as shown. Do not
place Bolts in the end holes of the Ridge
Cap.
6
DO NOT fully tighten Ridge Cap
Bolts until Peak Caps are installed.
This will ease assembly.
10823
Ridge Cap
1
JB
6
10823
JB
JB
Weather Stripping Tape should be applied in
a continuous strip along the length of the roof.
Leave holes on ribs open.
5