01AJ 01L 718920913 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. Gloves must be worn at all times to reduce risk of injury! DSM44 4’ x 4’ Nominal Size Customer Service: 1-800-851-1085 or assist@arrowsheds.com BUILDING DIMENSIONS Approx. Size † 4’ x 4’ 1,2 m x 1,2 m † Storage Area 17 Sq. Ft. 113 Cu. Ft. 2 1,6 m 3,2 m3 * See Inside for Detailed Safety Information.
SAFETY PRECAUTIONS... 02A Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.
ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base.
05A Q. What kind of base do I use? A. You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/floor, an Arrow floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included).
Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06A frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A.
HARDWARE LIST... Key No. Part No. Part Description Qty.
08AJ PARTS LIST... Key No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Part No.
ASSEMBLY BY KEY NO.
ASSEMBLY BY KEY NO.
ASSEMBLY OVERVIEW 11AJ Build the Floor Frame Install Corner Panels, Wall Angles, Door Jamb and Front Header Install Wall Panels and Wall Channels Attach Gables and Roof Beams Install Roof Panels, Decorative Gable Piece, Ridge Cap, Side Trim, and Corner Caps Install Doors Shed is now complete.
Step 1: Floor You will need for this page: SS SB (QTY: 8) 1 2 (QTY: 9) 12AJ 10741 1 10877 2 10743 1 F/R Floor Channel Side Floor Channel F/R Floor Section Attach one (1) Front/Rear Floor Section to a Front/Rear Floor Channel securing with one (1) Sand Screw as shown. Attach Side Channels securing with one (1) Sand Screw at each corner. 10744 8 Floor Section The Front and Rear Floor Section should be aligned with the Front and Rear Floor Channels as shown.
Step 1: Continued You will need for this page: SB (QTY: 2) SS (QTY:5) 10744 1 Floor Section 5 Slide Floor Section and Front/ Rear Floor Section into place. Secure using two (2) Sand Bolts and Nuts at the middle. 6 Secure ends of Floor Section to the Side Channels using two (2) Sand Screws as shown above. 10743 1 10741 1 F/R Floor Section F/R Floor Channel 13AJ SS 6 5 SS 10744 10743 SS 10741 SB SB SS SS 7 6 7 Attach Front/Rear Floor Channel using three (3) Sand Screws as shown.
Step 2: Front Corners and Door Jamb 13M You will need for this page: JB (QTY: 8) 1 10716 1 Right Door Jamb 10726 2 80057 1 Front Corner Panel Left Door Jamb Attach the Front Corner Panels to the Right and Left Door Jambs using three (3) Java Bolts and Nuts (#1-3) for each Panel. Place one (1) Java Bolt and Nut (#4) in center hole of Door Jamb as shown. 10726 80057/ 10716 1 Washers are to be used on painted parts only.
Step 3: Wall Framing You will need for this page: SS Assemblies from Step 2: JS • Front Right Corner Assembly (QTY: 12) 1 2 (QTY: 8) • Front Left Corner Assembly 15AJ 10701 2 10729 1 10813 2 Rear Corner Panel Rear Wall Angle Side Wall Angle Attach the Rear Corner Panels to the Floor Frame using two (2) Sand Screws for each Panel. 10732 10732 1 10813 Front Header Attach the Rear Wall Angle to the Rear Corner Panels using one (1) Sand Screw in each Panel.
Step 4: Wall Panels You will need for this page: 16AJ FASTEN TO WALL ANGLES 10725 6 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel 1 Lay out all Panels in the positions shown below. Double check that you have the correct Panel in each location. FASTEN TO WALL CHANNELS (STEP 5) Use the diagram to the right when attaching Wall Panels. • Secure the top row to Wall Angles. • Secure the middle row to Wall Channels (Step 5). • Secure the lower row to Floor Frames.
Step 4: Continued 17AJ You will need for this page: SB SS (QTY: 66) (QTY: 9) 2 Working one side at a time, lift the Panels into place and secure top and bottom of Panels with Sand Screws. Smaller rib spacings are in center of all walls. 3 Place one (1) Sand Bolt and Nut through the center hole of the Panel where Panels overlap, as shown. Corner Panels lay over Wall Panels. Continue until ALL Wall Panels have been installed.
Step 5: Wall Channels You will need for this page: SS (QTY: 30) 1 2 3 SS (QTY: 2) 18AJ 10739 3 Wall Channel 3 Install Wall Channel by placing Sand Screws through all remaining holes in Rear Wall Panels. Install Wall Channel by placing Sand Screws through all remaining holes in Side Wall Panels. Insert a Sand Screw in both rear corners where Side and Rear Wall Channels meet. Insert screw where Channels meet.
Step 6: Gables You will need for this page: SS (QTY:6) 10735 1 Left Gable 10734 1 18M 69835 2 Edge Trim Right Gable GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. 69835 Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables. Failure to do so could result in injury. Edge Trim MUST cover Gable edge. 1 Cut Edge Trim in half to make four (4) Edge Trim pieces. Install Edge Trim to top edge of Gables as shown.
Step 6: Continued You will need for this page: SS SB (QTY: 2) 3 10735 1 Left Gable (QTY:6) 10734 1 Right Gable 10733 2 Gable Brace 19M 67293 1 Weather Stripping Working one (1) Gable at a time, attach the Front Gables to the Header with six (6) Sand Screws as shown. 10735 10734 Gable must fit UNDER Side Wall Angle at corner.
Step 6: Continued You will need for this page: SB (QTY: 10) 10824 2 Roof Beam 9204 2 6 Roof Beam Brace 6 Place two (2) Roof Beams back-to-back with small holes on top. Fasten together using two (2) Sand Bolts and Nuts. 7 Position the Roof Beams at the top of Gables as shown and attach using two (2) Sand Bolts and Nuts on each side of Roof Beams. 8 Attach the angled end of Roof Beam Brace to the Gable with one (1) Sand Bolt and Nut as shown.
Roof Install Prep Page 22AJ Read through all of Step 7 before beginning Roof Assembly. At this time, measure diagonally to ensure the building is square. The building should be square at the base and at the top. This will make Roof Panels fit better and holes will better align. Be sure to carefully follow the Roof Panel Placement Order Diagram on this page. Uncrimped Rib Crimped Rib The building is square when diagonal measurements are equal.
Step 7: Roof You will need for this page: JS 10730 2 SB (QTY: 8) 23AJ Left Roof Panel Right Roof Panel (QTY: 8) JB (QTY: 4) 1 2 Secure each of the four (4) Roof End Panels to the Roof Beam and the Side Wall Angles by placing one (1) Java Screw in hole #1 and one (1) Java Screw in hole #2 (see diagram below). Carefully remove the Gable Edge Trim once the Panels are in position. Fasten the back Roof End Panels to the Gables by placing three (3) Sand Bolts and Nuts through holes #3 - #5.
Step 7: Continued You will need for this page: JS (QTY: 32) 4 10727 2 Roof Panel 24AJ 10728 2 Roof Panel Attach each of the two (2) Roof Panels (#5 - #8) to the Roof Beam and the Side Wall Angle using eight (8) Java Screws per Panel as shown.
Step 7: Continued You will need for this page: 67293 1 JB (QTY: 6) 5 Weather Stripping 25AJ 10823 1 Ridge Cap Seal the roof ridge by applying Weather Stripping across the entire roof ridge as shown. Leave holes on ribs open. 5 Weather Stripping Tape should be applied in a continuous strip along the length of the roof. JB 6 Attach the Ridge Cap to the Roof using six (6) Java Bolts and Nuts as shown. Do not place Bolts in the end holes of the Ridge Cap.
Step 8: Roof Trim You will need for this page: JB JS (QTY: 6) (QTY: 4) 26AJ 66447 2 10822 2 66183L 2 66183R 2 Peak Cap Side Roof Trim Corner Cap, Left Corner Cap, Right JS JB 1 (QTY: 4) 1 Slide the Peak Cap legs under Ridge Cap and secure at each end with two (2) Java Bolts and Nuts. 2 Position the Side Roof Trim as shown and secure with three (3) Java Screws. Leave each end hole open. 3 Position the Left and Right Roof Trim Caps as shown and secure with a Java Screw.
Step 9: Door Assembly You will need for this page: SS (QTY: 1) (QTY: 12) 10782 1 Door Panel 10718 2 Horizontal Door Brace Start assembly by sliding the Door Handle Brace into the middle of the Door and securing it with four (4) Sand Screws. Then attach the Horizontal Door Braces to each end of Door using two (2) Sand Screws on each brace. Once installed, attach Adhesive Pad between leg of Door Handle Brace and Door.
Step 9: Continued You will need for this page: FB LNB (QTY: 2) (QTY: 6) JB (QTY: 6) 66609 2 Hinge 26M 66809 1 66054 1 Locking Handle Right 3 4 3 5 6 66609 FB Latch 66811 1 Handle Backplate 66812 2 Hinge Plate Decor Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle and Handle Backplate using two (2) Long Bolts. Secure Backplate using two (2) Java Bolts and Nuts. Attach Latch Handle. to Locking Tighten set screw in Latch.
Step 9: Continued 29AJ You will need for this page: FB (QTY: 6) 8 NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! Hold Door up to Door Jamb and align holes on Hinges with holes on Door Jamb. Using six (6) Flat Head Bolts, secure Door to Door Jamb.
ANCHORING OPTIONS... 28M IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations. Anchoring Down The Building The entire floor frame MUST be securely anchored once the building is erected. Below are recommended ways of anchoring.
CARE & MAINTENANCE... 44A Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage.
ARROW ACCESSORIES... 29M ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9' (3,0 m x 2,6 m), use 2 kits. TOOL HANGING RACK Model No. TH100 The perfect tool organizer.