Installation Guide

16
10880
10880
10878
10879
LS
LS
10”
25,4 cm
10”
25,4 cm
10880
10878
10879
Front
16AP
You will need for this page:
(QTY: 24)
(QTY: 38)
Insert Front Wall Diagonals into the Front
Wall Assembly as shown and secure with
Large Screws.
3
10640
Wall Post
2
10652
Wall Post
(Hinge)
2
10627
Front Wall
Channel
6
Left Front Wall Assembly
10628
Front Wall
Diagonal
4
Lay out the parts and position them as
shown. Double check that holes align as
shown. If holes do not align, the Wall Post
(Hinge) is most likely upside-down.
1
2
Insert the Front Wall Channels into the
Wall Post and Wall Post (Hinge) as shown
and secure with Small Bolts and Nuts.
Assemble two (2) Front Frames together
with the Long and Short Fascias as shown
below and secure using Large Screws.
4
Right Front Wall Assembly
10640
10640
10652
10652
10627
10627
10627
10628
10628
10628
10628
LS
SB
LS
LS
LS
SB
SB
SB
SB
SB
LS
SB
SB
SB
SB
SB
SB
LS
LS
LS
LS SB
Door Header Assembly
SNAP
10627
10627
Part 10627 Front Wall Channel may
be joined in pairs. Bend to separate.
If you purchased a Door Kit, build two Front Walls.
FRONT
10880
Front Frame
2
10879
Short Fascia
1
10878
Long Fascia
1
Step 3: Front Wall
Front Frame faces
outside of building.
Align top holes
Overlap View