Warranty

The Base For Your Building
Base
BW08
Concrete Slab
The slab should be at least 4" (10,2 cm) thick. It must be level and  at to provide good support for the frame.
The following are the recommended materials for your base.
 2 x 4's (38 mm x 89 mm) (will be removed once the concrete cures)
 Concrete  Sheet of 6 mil plastic
We recommend for a proper strength concrete to use a mix of:
1 part cement  3 parts pea sized gravel  2 1/2 parts clean sand
Prepare the Site/Construct a Base
1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp  rm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 2x4 (38 mm x 89 mm)
lumber.
5. Pour in concrete to  ll in the hole and the frame giving a
total of 4" (10,2 cm) thick concrete. Be sure surface is level.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Note: Before beginning construction, check local building codes
regarding footings, location and other requirements.
141 1/8"
358,5 cm
FRONT (ROLL-UP DOOR)
10' - 111 3/4" 283,8 cm
17' - 198" 502,9 cm
24' - 284 1/4" 722,0 cm
31' - 370 1/2" 941,1 cm
Note: Finished Slab dimensions, with lumber removed.
Reinforcing
Rods
Reinforcing
Rods
Optional Footer Type of Foundation
Welded Wire
Fabric
8