Outdoor Storage User Manual

43
Parts Needed For
VV
VV
V
erer
erer
er
tical tical
tical tical
tical
TT
TT
T
rr
rr
r
acac
acac
ac
ks Roll-Up-Doorks Roll-Up-Door
ks Roll-Up-Doorks Roll-Up-Door
ks Roll-Up-Door
Step 31Step 31
Step 31Step 31
Step 31
BW43
67510 Right Vertical Track (1) 67510 Right Vertical Track (1)
67510 Right Vertical Track (1) 67510 Right Vertical Track (1)
67510 Right Vertical Track (1)
67509 Left Vertical Track (1) 67509 Left Vertical Track (1)
67509 Left Vertical Track (1) 67509 Left Vertical Track (1)
67509 Left Vertical Track (1)
STEP
22
22
2
STEP
11
11
1
STEP
44
44
4
STEP
33
33
3
NOTENOTE
NOTENOTE
NOTE
When rib neck bolts are inserted
in the track, use bolts with heads
located on the inner side of the
track to prevent interference with
the movement of the rollers.
11
11
1Insert the
roller roller
roller roller
roller shaft into the barrel
holes on the hinges furthest out from
the face of the end stiles on both
panels. Note that #1 hinge has only
one barrel. Insert rollers through the
tabs on the bottom brackets on bot-
tom section.
22
22
2Attach
right right
right right
right and
left vertical tracksleft vertical tracks
left vertical tracksleft vertical tracks
left vertical tracks
loosely to right and left track supports
using 1/4-20x1/2" hex head bolts and
square nuts.
33
33
3Attach spring latch
strikers strikers
strikers strikers
strikers loosely
to vertical tracks using 1/4-20x1/2"
rib neck bolts and square nuts.
44
44
4Lift the bottom section and insert
the rollers into the vertical tracks. Slide
the panel down and level across top.
Shim to level if necessary.
55
55
5Insert lock section into vertical
tracks. Attach hinges from #1 to #2
panel by inserting #10Bx1/2" truss
head screws at bottom edge of lock
section. Do not fasten the last door
panel at this time.
STEP
55
55
5