User`s guide
42
Safety
Getting
Started
Battery
Installation
Installation
Ethernet
Configuration Usage Troubleshooting Glossary
Touchstone TG862 Telephony Gateway User’s Guide
Patterns: Startup Sequence
The following table shows the Telephony Gateway light patterns during each phase
of the startup sequence. There are two phases of startup; the Telephony phase and
the cable modem phase. Both are outlined below.
Note: The US/DS indicator flashes during startup, and turns on when the Tele-
phony Gateway establishes a connection.
Power,
US/DS,
Online
Telephone
Battery Description
1 2
Off Off Off Off No power to Modem
Flash Flash Flash Flash Power-on Self Test
“Cable Modem Start Up Sequence” Begins
On Flash Off Off
Retrieving telephone net-
work information
On Off Flash Off
Retrieving telephone line
information
On Flash Flash Off
Activating telephone
service
Normal Operation Begins