Installation Instructions
INSTALL REMAINING MAIN BEAMS 
AND CROSS TEES
•  Complete the installation of rows of main
beams.
•  NOTE: If you have additional rows of main
beams to install, stretch a second string from
one side of the room to the other, aligning it
with the rst four-foot cross tee as shown.
•  This second string will be your guide for
cutting the remaining rows of main beams.
Just measure from the end wall to the string
to determine the distance for the
rst cross tee slot you will use.
•  You must line up all cross tee slots for the
grid to be square.
INSTALL PANELS
•  Slightly tilt panels, lift above framework,
and gently rest on cross tee and main beam
edges.
•  Measure and cut border panels individually.
Using a leftover cross tee or main beam
section as a straight edge, cut panels face
up with a very sharp utility knife. Border
panels may require eld cutting of Tegular
edge details. All eld cut edges “exposed to
view” should be colored to match the factory
nish. Armstrong
®
 SuperCoat
™
 Ceiling
Panel Touch-up Paint is recommended.
LIGHTING AND OTHER FIXTURES
Lighting and other xtures must be 
supported by the grid, not by the ceiling 
panels. Depending on the size and weight of the 
xtures, extra hangers may be required.
For more information and details about 
installing Armstrong Suspended Ceilings, 
call your local Armstrong representative or visit 
armstrong.com/ceilings.
Tilt panels above frame and 
drop into place
Grid may require extra hangers 
to support weight of lighting 
xtures
Align second guide string with 
rst four-foot cross tee
Tegular-edge border panels 
may require eld cutting. Cut 
border panels face up and 
paint edges







