Installation Guide
5
Armstrong S-500 Seam Coater/Application
When using the S-500 Seam Coater Kit make sure flooring is installed, seam area has been
hand rolled and the entire floor rolled with a 100 lb roller. Then apply the seam coater as
directed on package.
6. Finish the Job
Replace or install baseboard moldings or coved wall base to cover expansion zone (gap) around
perimeter of room. Fasten molding to vertical surface; do not nail through new floor or into
expansion zone.
Leave a slight clearance between molding and flooring so any effects of seasonal movements
in your home due to temperature or humidity changes will be minimized. Should a small
bubble or buckle occur, the flooring should be gently lifted or pulled back from the pinch point
and retrimmed.
At doorways where new flooring meets another floor surface, use a trim molding that covers the
edges of the floor. This is the preferred method of installation.
.
Precautions for All Installation Options:
Do not wash or scrub the new flooring for at least 5 days after the installation. This will help
prevent excess moisture and cleaning agents from interfering with the bond of the fresh adhesive
or vinyl flooring tape.
When moving appliances or heavy furniture, lay a plywood panel on the floor and “walk” the item
across it. This protects the floor from scuffing and tears.
Use floor protectors, such as Armstrong Floor Protectors, on furniture to reduce indentation. The
heavier the item, the wider the floor protector needed.
NA-5917-915