Instructions / Assembly
adjusted for the 10 unit grid
STANDARD SUSPENDED CEILINGS
Assembly and Installation Instructions
1. GENERAL
1.1 This installation document is intended as a general application
overview, covering essential steps of a suspended ceiling installation.
This document represents standard methods as supported by the
manufacturer and are in addition to following the standards outlined
in ASTM C636. These standards represent the manufacturers
recommendations; however, all installations are subject to
requirements set forth by the authority having jurisdiction.
1.2 These instructions should be supplemented with Armstrong’s "The
20 Minute Ceiling Installer" video for examples of the installation steps,
as well as the product specic installation instructions of the product
being installed.
2. TOOLS REQUIRED
2.1 Here is a list of the most common tools needed for installing a
suspended ceiling. Required tools and materials may vary based on
job-specic conditions.
• PPE: Cut resistant gloves, safety glasses, hard hat, steel-toe boots
• Ladder(s), rolling scaffold
• Lasers: horizontal line leveling, vertical alignment, point
• String line: control/dry line
• Chalk line
• Tape measure
• Carpenter pencil
• Cordless drill with screw tips and drill bits
• Snips: metal cutting tin snips
• Rout hole punch
• Pop riveter, aluminum white pop rivets
• Lineman pliers with wire cutter
• Hammer