Cut Sheet
FEN102 nail-on
with two FE102C centers
3 Snap the ends of the original
two-gang box to each side of the
center section assembly.
Catalog UPC/DEI/NAED FE Series Attachment Method Unit Std
Number Mfg. #018997 Gangable Box /Application Pkg Pkg
FEN102 01578 Two gang (includes bracket) Nail-on for New Construction 1 10
FES102 01577 Two gang (includes bracket) Screw-on for New Construction 1 10
FE102C 01579 Each adds one gang Center Section for FEN102 and FES102 10 10
FER102 01575 Two-gang w/ Mounting Wing Screws – Old Work 1 10
FER102C 01576 Each adds one gang Center Section for Old Work FER102 10 10
FE102D 01586 Voltage Divider OPTIONAL 25 25
Gangable Plastic Box
Build the Box You Need • No Tools! • Saves Time & Money
Distributed by
Patents pending
FE series 1010/25M
1 Stauffer Industrial Park
Scranton, PA 18517
800/233.4717
Fax 570/562.0646
www.aifittings.com
www.arlnew.com
Arlington
©2010 Arlington Industries, Inc.
1 Start with a two-gang FEN102, FES102 or FER102.
Determine how many gangs you need.
Here’s How the Gangable Box Works...
2 Each center section adds one gang to the box.
Snap the number of centers necessary to make a
new, larger box, from three- to ten-gangs!
New Construction - Nail on
Note To disassemble or separate the parts, insert a
screwdriver between the tabs at the top of the box
(on each side) as shown above, and twist.
New Construction - Screw on
For Old Work
Mounting wing screws hold
box securely against the wall
FEN102
FES102
FER102
FE102C
FER102C
FE102D
FES102
screw-on
FEN102
4 For additional support of a larger box, attach the
supplied steel bracket to the unsupported side of the
box. Attach the bracket to an additional 2x4 as shown.
FEN102 nail-on
with five FE102C centers
Use the OPTIONAL FE102D voltage divider for power and
low voltage in the same box
FES102, FE102C
FE102D
FER102, FER102C