Installation Guide
EUREKA
- 4'⅜"). After checking that it is vertical, take off the column and drill with a D. 8 mm - 5/16” bit. Use the elements
B11, B12 and C31 (Fig. 1). If installing outdoors seal the point where element F01 rests on the ground with
silicone (not included).
Position the rst baluster C03 (H. 1230 mm - 4' 30. ⅜") together with the element F07 after cutting it by 35 mm - ⅜".
Finally secure element F07 to baluster C03 by means of the components C31.
Heat the handrail A02 until it is malleable (g. 10): 31.
1) rest the handrail on the cover of the wooden box,
2) slowly heat it performing circular movements without stopping,
3) overturn the handrail and repeat the operation.
Position the handrail A02 on the balusters C03 (using gloves). Fix it on the rst column C03 at the top with 32.
elements B54 and B55 after drilling it with a D. 5 mm - 13/64" bit in its lower part before it cools (g. 9).
Cut the exceeding part of handrail A02 so that it does not hamper the operations.33.
Drill handrail A02 in correspondence with the holes present on all the elements B53 and x it with elements 34.
B54 and B55 (g. 1).
Insert the remaining balusters C03 in the treads L02 in close succession (for a D. 120 cm - 3' 11 ¼” staircase 35.
only one intermediate column H.1135 mm - 3'8 ⅝”; for D. 140 cm - 4'7 ⅛" and D. 160 cm - 5'3" staircases two
intermediate columns H. 1100 mm - 3'7 ¼" and H. 1170 mm - 3'10"). Tighten elements C31 taking care that
they are vertical and x them to the handrail A02 using elements B54 and B55.
In correspondence with the rst baluster C03 of the staircase, perform a nal cut of the handrail A02.36.
Insert element A03 on handrail A02 (eliminate burrs due to cut) using the glue X01 after heating the end of 37.
handrail A02 (g. 1).
Secure elements C31, D32 and D33 in a permanent manner using the part C36.38.
Complete the railing assembly by inserting elements B82 into the lower part of the balusters C03 (g.1).39.
Assembling the balustrade
Screw column C04 onto element G01 protruding from the landing E03 (g. 1).40.
Fasten element B01 onto column C04 using element C31 and seal it with silicone if installing outdoors (Fig. 1).41.
Fix elements F01 using the components B89, B27, B23 in the holes present on the landing E03 as in g. 1.42.
Position the shorter balusters C03 H.975mm - 3’2 43. ⅜” in the elements F01 (applying silicone, not included, to
seal the space between the two elements if installing outdoors) and tighten element C31 (g. 1). In the hole
with the elements D32 and D33 on the landing E03 use a baluster C03 H.1100 mm - 3’7 ¼” cutting it by
95 mm - 47/64”.
Secure the handrail A18 using elements B54 and B55 (g. 1).44.
Connect the end part of the railing to the short stretch of the balustrade on landing E03 using the appropriate 45.
xture obtained when assembling elements A20, A03, C92 and B08 (g. 11). On the handrail A02 clean the cut
and heat the end part, x the caps A03 of the xture obtained (after cleaning the cut and heating the end part of
the handrail A02) using the glue X01, x in a permanent manner with screws C87 (g. 11).
Final Assembly
To further stiffen the staircase at intermediate points, secure elements F09 to the wall and join them to the 46.
balusters C03 using elements F08. Drill using a D. 8 mm - 5/16” bit and use elements B36, B37, C29, B11 and
B12 (g. 13).
Glue the nosings H06 onto the treads L02 using element B96 (Fig. 1). If installing outdoors use silicone.47.
Glue the step board H03 and H04 onto the landing E03 using element B96 (g. 1) for use indoors, and silicone 48.
(not included) for use outdoors.
Maintenance
After assembly check the integrity of the staircase and touch up any damaged parts with a rust-proong undercoat
(not provided) and a topcoat of varnish included in the supply.
To ensure a long life of the product, it is recommended to periodically perform the above operation.
In case of accidental damage to the varnishing, and in any case at least every 4 months, carry out the above
described operation.
Stairs installed in particularly aggressive environments (for example, near the sea, in industrial areas, etc.) must be
washed every month with fresh water and non-aggressive detergents, without using pressurized water.