Installation & Assembly

Door Preparation - Strap and Anti-jump block
Step 2. CONCRETE Wall Preparation
Use your guide marks to position the track in place, ensuring that it is level.
Mark the mounting holes on the track using a pencil. Then, pre-drill 5/16"
holes into the concrete according to your marks.
Step 3. CONCRETE Track Installation
Insert the provided anchors and carriage bolts (with washers). Unscrew and
separate the carriage bolts and anchors, and take care to install correctly,
securing with a wrench.
Step1. CONCRETE Wall Preparation
FOR DRYWALL INSTALLATION – PLEASE PROCEED TO STEP 4.
Minimum 2”
(51 mm)
3/8" (9.5 mm) –
1/2" (12.7 mm)
Gap under the
door
Door Height + 1 3/4"
Add +1 3/4” to the door height (H) and measure up from the floor to find
the height of the center of the track. Ensure a gap of 3/8" - 1/2" at the
bottom of the door and make marks on the wall on both the left and right
sides of the door opening. A minimum of 2” track clearance must be
maintained on both the left and right sides of the door opening.
1
2
3
4
Your Barn Door arrives with holes for the hanging straps pre-drilled.
Use the included carriage bolts to attach the straps to the door.
Next, position each anti-jump bumper at least 2" in from the edge of the straps.
Tighten slightly to secure in place
H+1 "
16
11
1"
1 3/8" (30mm)
5/16" (8mm)