User manual

Model: EC-GOLD
ECGOLDUM17.DOC Rev: 1.7
- 6 -
2.0 INSTALLATION
2.1 MECHANICAL INSTALLATION
Figure 2.0
Locate the EC-Gold on a vertical surface away from drafts, open doors or windows, condensation or
dripping moisture.
The vertical placement (above the floor) depends on the gas being monitored. For CO, the unit should be
located within the breathing zone: about 4 - 5 feet above the finished floor*. For other gases, refer to an
Arjay Engineering representative.
* Check local building codes (i.e. Ontario Building code requires mounting 2’11” to 3’11”).
MECHANICAL INSTALLATION
2.25"
5.25"
6.00"
3.00"
7.75"
BASE
FRONT COVER
Mounting holes
(4 Places)
EC GOLD
TRANSMITTER
BOARD
Dual 3/4" & 1/2" diam.
knock-outs for rear entry
cabling.
MECHINST.DSF
Dual 3/4" & 1/2" diam.
knock-outs for top entry
cabling.
TOP VIEW
BASE
FRONT COVER