Operation Manual
14 GB
Installation instructions
For easy installation, proceed as follows:
• Fix the wall brackets and Splashback
• Fix the canopy
• Electrical connection and working test
• Ducting or Recirculation fitting
• Fix the telescopic chimney
Fitting the wall brackets and Splashback
Please refer to (fig.2a-b):
• Draw a vertical line on the
wall, from the centre of the
cooking appliance up to the
ceiling, using a marking pen.
This is to ensure the correct
vertical alignment of the
various parts.
• Fixing the wall brackets
item
2:
a) Place one of the brackets
2
against the wall
approximately 1 or 2 mm
from the ceiling or from the
top limit, aligning its centre
(slot) with the vertical line.
b) Mark the centres of two
keyholes in the bracket on
the wall.
c) Rest the other bracket 2
against the wall, aligning it
with the vertical line, at a
distance X measured as
shown in fig. 2 equal to the height of the upper chimney element S supplied with the
hood. The position X may vary, according to the various sizes of upper chimney element
available.
d) Mark the centres of the keyholes in the bracket on the wall.
• Drilling fixing holes item 1:
a) Mark a point on the vertical line at a distance from the cooking appliances of:
d =970 min (distance without splashback).
d =height of splashback + 320 mm (distance with splashback).The distance H is the
minimum height in mm from the cooking appliances to the bottom edge of the front panel
of the hood.
b) At the point marked, draw a horizontal line parallel to the cooking appliances.
c) Drill two holes in the wall
1 using an 8 mm drill bit (fig.2a ), and insert the rawl plugs and
screws into the holes 1 (4.2 x 44.4 screws). Fix the screws, leaving a space of 5-6 mm
232
260
11
2
260
11
20
X
H min 650
d = 970 min
Fig. 2
a b