Installation manual

Supplied By www.heating spares.co Tel. 0161 620 6677
20
B005
Removing the P.C.B.s
1.
Isolate electricity;
2.
Remove the front cover of the boiler;
3.
Remove both left and right inspection panels;
4.
Remove the pressure gauge cover;
5.
Remove the mounting screws “A7’
(see fig. 1.51)
;
6.
Disconnect the connection cable”A8”
(see fig. 1.52)
;
7.
To remove the 24V P.C.B.: remove the electrical plug
connectors and screws “A9”
(see fig. 1.53)
;
8.
To remove the 240V P.C.B.: remove the electrical plug
connectors and screws “A10”
(see fig. 1.54)
;
9.
Replace either P.C.B. in reverse order.
Fig. 1.51
Fig. 1.52
Fig. 1.53
Fig. 1.54
A7
A7
A7
A7
A8
A8
A9
A9
A10
A10