4. Commissioning
User information
Inform the user on how to operate the installed system.
In particular, hand this instruction manual to the users, inform-
ing them that is must be kept near the product at all times.
Inform potential users that the following actions must be car-
ried out:
Periodically check the system water pressure.
Restore system pressure, by deaerating the system
when necessary.
Adjust the setting parameters and the adjustment de-
vices to optimise operation and reduce the systems
operating costs.
Perform regular maintenance, as envisaged in the
standards.
4.12.1 Filling the system
Check the water pressure on the pressure gauge regularly and
make sure that the pressure is between 0.5 and 1.5 bar when
the system is cold.
If the pressure is below the minimum value, it must be in-
creased through the filling cock.
Close the cock once the average value of 1.2 bar has been
reached.
The maximum pressure of the heating/cooling system is 3 bar.
Only for NIMBUS HYBRID MODULE NET R32
For filling operations, open valve (A) and follow the instruc-
tions contained in the boiler manual.
A
Fig. 74
a
The installation, initial start up, and configura-
tion must be carried out in accordance with the
instructions, by a qualified technician only. The
manufacturer declines all responsibility for dam-
ages caused to people, animals or possessions
following incorrect installation of the appliance.
a
If frequent fillings (once a month or more fre-
quently) are required for your system, this indi-
cates a potential problem with the installation
(leaks, expansion vessel problems). Contact your
trusted installer to analyse and solve the prob-
lem quickly, and to prevent damage caused by
corrosion of the components due to excessive
water replacement in the system.
4.1 Initial start-up
a
To guarantee safety and correct operation of the
system interface, it must be commissioned by a
qualified technician in possession of the skills as
required by law.
4.1.1 Start-up procedure
Insert the system interface on the connection slide
pushing it gently downwards. After a brief initialisation,
the device will be ready for being configured.
The display screen shows “Select language. Select the
desired language by rotating the selector.
Press the selector
.
The display shows the “Date and Time. Turn the selec-
tor to select day, month and year. For each selection,
always press the selector to confirm. Once the date has
been set, the selection shifts to the time setting. Turn
the selector to set the exact time, press the selector to
confirm and move to the minute selection and setting.
Press the selector
to confirm.
Once the date is set, the selection moves to the daylight
saving time setting. Turn the selector to select AUTO or
MANUAL. If you want the system to automatically up-
date the period when daylight saving time is in use, se-
lect AUTO.
Press the selector
.
NOTE:
The display is set by default with a multi-level set-point time
schedule. If a message appears concerning the time schedule
conflict:
On the home page press the “Menu” button
to ac-
cess the user menu.
Turn the selector
to select the Advanced settings”
menu, then press the selector .
Turn the selector
to select the Type of service of
the schedule programme, then press the selector .
Turn the selector
and select the same value
(Two-Level Set-Point or Multi-Level Set-Point) present
in the other User Interfaces (see technical parameter
0.4.3 on the boiler interface, if available) and press the
selector .
If there is still a conflict, repeat the procedure and use
the selector to choose the two-level set-point, then
press the selector
.
NOTE:
Some parameters are protected with an access code (safety
code) which protects the appliances settings against unau-
thorised use.