Alteas ONE Net Installation Manual
/ 9
PRODUCT DESCRIPTION
Overall Dimensions
Minimum clearances
In order to allow easy access to the boiler for maintenance
operations, The boiler must be installed in accordance with the
clearances stated below.
A. Central Heating Flow
B. Domestic Hot Water Outlet
C. Gas Inlet
D. Domestic Cold Water Inlet
E. Central Heating Return
28
745
200
150
315 (24)
385 (30-35)
120 120
200
180
65 6567 67
25745
385 - mod. 30-35
450
053
003
50 50