Alteas ONE Net Installation Manual

52 /
MAINTENANCE GUIDE
3.7 Pump
Tools
TIME 10 min
Drain the boiler (see 3.3). Remove the clip and the two screws
1
Disconnect the pipe and then move the pump to the right to
disengage
2
Remove the pump
3
3.6 By-pass assembly
Tools
TIME 5 min
Drain the boiler (see 3.3). Rotate clockvise to unhook the
locking ring of the diverter valve.
1
Remove the clip and pull the assembly towards you
2
3