Installation Guide
03
INSTALLATION SKETCH
1.tap
2.drainage switch
3.control panel
4.air conditioning
5.water in
6.nozzle
7.drainage
8.pillow
9.air bubble jet
3
4
2
7
8
6
5
11
9
1.The products should be installed by technical guy who are got 
the certificate or those technical who are assign by dealers. The 
main power switch and electronic leakage device should be 
installed.
2.The plug of electronic should be installed above the steam 
generator and the length of electronic wire not less then 
1800MM from the earth.
3.There are should be with main power switch for hot and cold 
water pipe of steam room and the water pipe should be connect 
to drainage water pipe.
4.Install the products according to the diagram of installation
 When fixed the place for the products.
ILLUSTRATION  OF  INSTALLATION
INSTALLATION  PROCESS
 (STEP 1)
04
2
0
0
90
0
1250
Cold water pipe
1500
The socket 
of power and 
the socket 
of telephone
Hot water pipe
1
50
400
The socket 
of power
2250
910
1710
650
250