Installation Guide
h. You will have to line up this mounting bracket so that the bend in the bracket is on the horizontal
line you drew earlier. Meanwhile, make sure the mounting holes are still centered on the mark you
made for the bracket’s location.
i. Mark both of the mounting holes in the mounting bracket.
j. Repeat this process for the other mounting bracket and you will have successfully marked the loca
tions for both the top brackets.
k. Use the location of one of the top mounting brackets as a reference for the next measurement.
Measure the distance “X” straight down from the top mounting hole and make a mark. (“X” is the
distance between the two mounting straps.)
l. Repeat this process with the location of the other top mounting bracket.
m. Use one of the last two marks you made to place the third mounting bracket. Center the top
mounting hole of the bracket within the mark. Make sure the mounting bracket is vertical
and mark both of the mounting holes.
n. Repeat the last step with the fourth and last mounting bracket.
o. Drill each hole location. Use a 5/16” diameter drill bit with the appropriate drill bit for your wall
surface.
TIP: Pilot drill with a smaller drill bit before stepping up to the nal size if your wall surface is prone to
chipping and cracking.
p. Place the plastic wall anchors into the holes you have drilled.
q. With a Phillips screwdriver, or a drill with a Phillips bit, attach the mounting brackets to the wall
surface with the use of the provided screws.
Connect Your Shower Panel to Your Water Supply
Aer installing the mounting brackets for your shower panel, the nal water connections will be made.
1. You will nd the input cold and hot water connections on the back of the thermostatic valve on
the shower panel unit. e cold connection is labeled with a blue sticker and the hot connection is
labeled with a red sticker.
2. Connect each of the exible hoses to the thermostatic valve. en connect each hose to the corre
sponding cold and hot water supplies. Secure both hoses.
IMPORTANT: Use the rubber washer included in your purchase.
3. Turn on each of the valves if you installed cut o valves on your supply line. Check for leaks in
both the cold and hot water supply. If there are no leaks, you may move on to the next process in
the installation.