User's Manual

ARCXTEND 5.8 GHZ USER MANUAL – R1.0, ISSUE 1
Copyright 2005 Arcwave, Inc. 27
Note: The CPE accommodates a mounting pipe with of 1-1/4” to 2-3/8” in diameter and the
CPE and mounting pipe require a minimum of 12 inches clearance on all sides for optimal
performance.
Note: The CPE should be located as close to the edge of the building nearest the hub as
possible. When the CPE is mounted towards the middle or back of the building, the incoming
wireless signal may be reflected by the rooftop impairing the performance of the link. The CPE
must be placed high enough on the rooftop to provide the required Fresnel zone clearance
(Fresnel zone = blockage free zone).
Affix the CPE mounting mast
)Referring to Figure 4-2, loosen the "Side/side alignment bolts and slide the CPE over the
mounting pipe. Visually align the CPE in the direction of the Hub and snug the side/side
alignment bolts to hold the CPE in place.
Mounting bracket (included)
Elevation alignment bolt
F-connector (before taping)
Pipe
Side/side alignment bolt
Figure 4-2: CPE Mounting Diagram
Install the Coaxial Cable and Ground Connection
)Install the coaxial cable and ground connection as shown in Figure 4-3: