Technical data

7
Onzen Technical Guide North American Topside
1.12 W C A/A & L
ABBREVIATION/ACRONYMS DEFINITION CORRECT CHEMICAL LEVELS
CH Calcium Hardness 50 - 150 ppm
TA Total Alkalinity 80-100 ppm
pH Potential Hydrogen 7.2 – 7.6 ppm
FCL Free Chlorine 1 – 3 ppm
ORP Oxidation–Reduction Potential 600 - 1000
1.13 L L S A A & S
ABBREVIATION/
ACRONYMS
DEFINITION
SEING
2 PUMP SPA
SEING
3 PUMP SPA
bL Blower (erapy Air)
bL 1 (Installed)
bL 0 (Not installed)
bL 1 (Installed)
bL 0 (Not installed)
CC Cooling Cycle CC 0 CC 0
CF Clean Filter Reminder CF 0 (O) CF 0 (O)
CP
Chlorine Production
(Onzen Cycle Duration)
CP 0 indicates that Onzen is o.
CP 1 indicates Onzen runs 4 hours daily.
CP 2 indicates Onzen runs 8 hours daily.
CP 3 indicates Onzen runs 12 hours daily.
CP 4 indicates Onzen runs 16 hours daily.
CP 5 indicates Onzen runs 20 hours daily.
CP 6 indicates Onzen run 24 hours daily.
CP 4 (16 Hours) is the
suggested seing for
Start Up - rst 24 hours.
Following Start Up it
is recommended to set
Onzen Cycle Duration
between 2-4 hours.
en monitor and adjust
according to spa usage
and bather load.
CP 4 (16 Hours) is the
suggested seing for
Start Up - rst 24 hours.
Following Start Up it
is recommended to set
Onzen Cycle Duration
between 2-4 hours.
en monitor and
adjust according to spa
usage and bather load.
dH Delay Heater dH 2 dH 2
FC
Filter Control FC 0 indicates that the spa
will stop ltering 2 degrees above the set
water temperature. FC 1 indicates that the
spa will always lter.
FC 0 FC 0