Is Sanitizer Being Produced and Delivered to Spa Water?
is test requires:
· e water temperature to be at least 80º F (27 º C).
· e Filter Cycle Duration to be set to 00.
· CP Chlorine Production Time (Onzen Cycle Duration) programmed to CP 6. Onzen system will run for 24 hours
per day.
Step 1. Set Filtration Cycle Time to Fd 00 (= No Filtration)
Press the Filter Cycle Key.
e Filter Cycle Duration details “Fd” will be displayed “Fd XX” .
Use down arrow key to change the Filter Cycle
Duration to Fd 00.
is de-activates the ltration pump so you can see the mist of
gas bubbles produced by the Onzen System.
Step 2. Go into Low Level (LL) Seing
Hold the Filter Cycle key down for 20 seconds until “bL 0
OR bL 1” is displayed.
Step 3. Scroll to CP (Chlorine Production) Seings
Scroll through the Low Level (LL) seings by pressing the Filter Cycle
key until it reads “CP X ”. (“x” will be a value between 0 & 6).
Step 4. Change CP Seing to CP 6
Change CP seing to CP 6.
CP 6 programs the Onzen system to produce Chlorine 24 hours daily.
Step 5. Scroll rough Low Level Seings
Continue scrolling through the Low Level seings by repeatedly
pushing the Filter Cycle key until the pack resets.