Refrigerated Counter-Top Prep Installation,Operation & Maintenance Manual
Table of Contents Safety Tip 1 Introduction 1 Pack Contents 1 Installation 1 Fit Glass Panels 1 Operation 1 Storing Food 1 Turn On 2 Manual Defrost 2 Cleaning,Care & Maintenance 2 Cleaning the Condenser 2 Troubleshooting 2 Technical Specifications 3 Electrical Wiring 3 Disposal 3 Compliance 3
Installation Installation Page 1 Page 1
2. Ensure pan bays are full at all times,even if the pans are unused or empty.Empty bays will greatly reduce efficiency of the appliance. Periodically cleaning the condenser is mandatory and failure to do so will void the warranty Periodically cleaning the condenser is mandatory and failure to do so will void the warranty.
Technical Specifications Model Voltage Power Current Temperature Capacity Range Dimensions HxWxD(mm) Weight (Kg) ACP40 115V/60Hz 140W 1.4A 35.6~50 F 6xGN1/6 Container 430x1000x395 25 ACP55 115V/60Hz 140W 1.4A 35.
Arc c Air Warranty One year parts & labor warranty Arc c Air warrants, to the original purchaser, all of its new equipment to be free from defects in material or workmanship, under normal use and maintenance service, for a period of one (1) year from the date of original purchase or 15 months a er shipment date from the manufacturer, whichever occurs first. Warranty coverage is limited to the repair and/or replacement, including labor charges, of defe ve parts and/or assemblies.