Specification
4
FLUSH SYSTEM/
CHECK FOR LEAKS.
Turn on hot and cold water
supplies and flush water lines
for one minute.
Check all connections at arrows
for leaks.
Retighten if necessary,
but do not overtighten.
Hot
Cold
Cold hose
Hot hose
3
2
Make sure all fittings
and end connections
are free of debris.
Faucet connections are 3/8"
compression fittings.
Secure metal nut on faucet supply hoses
to supply valve connection and hand tighten,
then tighten one additional revolution with wrench.
DO NOT OVERTIGHTEN.
Repeat for other hose connection making sure the hose with
the hot label is connected to the hot supply valve and the other
hose is connected to the cold supply valve.
WARNING: Do not use pipe dope or other sealants on water connections.
1.Attach the mounting stud(2) under the faucet
and tighten it well.
2.Slide tubes down through mounting hole
on bathroom counter .
3.Place washer (3) and metal plate (4) over
mounting stud (2) under bathroom counter .
4.Screw the lock nut (5) onto
the mounting stud (2) , tighten the screws (6)
to fix the faucet body.
1
2
3
4
5
6
1