Installation Guide
1 2 30mm
Max deck
Thickness
. "( )
.
3x1.2 to 1 5
32mm to 38mm
Hole Size
" . "
( )
3x 1 8. "
( )45 mm
4 to 16"
"
( )
100mm to 406mm
9.5 to 21.5" "
( )
240mm to 546mm
(131mm)
5.1"
TWO HANDLE LAVATORY
CENTERSET FAUCETS
994337
OPERATION
• Double lever style hand les
• Max im um han dle(s ) rotation angle is 90˚ to full on
• Rotate hot side counter clockwis e to op en (clockwise to close)
• Rotate col d side clo ckwise to open (counter clockwis e to clos e)
To REA D ALL the instructions completely before beginning.
To REA D ALL warnings, care, and maintenanceinformation.
Chr me/Brush nickel/ORBo
You may need
Models
Finish:
Hot Cold
For easy installation of your f aucet you will need:
2 4 61). ''(Ø
1 1/4 32)''(Ø
1.5''(40)
2 2 57). ''(Ø
SHUT OFF WATER SUPPLIES .
Slide hot (1) and cold (2) end valves
with gasket (3) through sin k.
Secure end valves with washers (5)(6)
& threaded bra ckets (7). Han d tighten
brackets (7) on to shank (4). Lock
brackets into position by tigh tening
screw (8).
1
3
2
4
Install spout (1) gasket (2) , Secure
with washer and nut (3). Note: If sin k
is unev en, use sil icone under the
gasket.
Align tabs and tab s on quick
connects . Push quick connects
firmly upw ard and snap onto
rec eiving tube tab .
Pull down modera tely to ensure
each connec tion has been made .