Installation & Assembly

1. Screw wheels onto bottom of left & right legs ;
2. Attach the bottom wire to the left & right legs
together with screws;
3. Attach tube to left & right legs with screws
to form a stand;
4. Attach front、 back、left、right wire together with screws;
5. Attach lower top wire to the top of left wire
and right wire with screws;
6. Attach upper top wire to the cage body with screws;
7. Screw cup holders to feeder door and put the feeders into
the holders,then put the perches into the cage body;
8. Put the body on the stand ;
9. Slide the grill、tray inside the Body;
10.Put the boffle to hang front wire.
Grill(密网) 1pcs
Upper top panel(wire)(上盖网) 1pcs
Low top panel(wire)(上盖网) 2pcs
Bottom grill(脚网) 1pcs
Baffle(挡板) 1pcs
Tray(铁盆) 1pcs
Wooden perch(木棍) 1pcs
Wheels(2寸8厘脚轮) 4pcs
Feeders(4寸杯) 4pcs
Holders(4寸合圈) 4pcs
Assembly Instructions(包装图) 1pcs
Screw bag(螺丝包) 1pcs
Item No:
Box List
Box Worker Q C ganger
Part name Quantity
Front wire(前网) 1pcs
Back wire(后网) 1pcs
Left wire(左网) 1pcs
Right wire(右网) 1pcs
Left & right leg(脚框) 2pcs
Horizontal tube(横管) 2pcs

Summary of content (1 pages)