57-DVRS50 Gas Fired Vented Room Heater (Direct Vent) SERIAL NUMBERS 510000 AND HIGHER USERS’ INSTALLATION OPERATION and MAINTENANCE MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
INTRODUCTION Congratulations on choosing a Brigantia! The 57-DVRS50 is one of the most advanced Direct Vent Gas Fireplace heaters available today. It is solidly designed using the latest technology and manufactured to the highest quality. It is our aim to provide you with an appliance for many trouble-free years of reliable service. Some of the many features of your 57-DVRS50 are: Heater Classification The 57-DVRS50 is classified as a heating appliance.
TABLE OF CONTENTS Caution and Safety Instructions 4 Appliance Certification, Installation Codes and Specifications 5 Rating Plate 6 Appliance Dimensions 7 Framing Dimensions and Clearance to Combustibles 8-9 Installation Instructions 10-12 Venting Instructions 13-18 Gas Connections 18 Panel & Baffle installation 19 Burner media, Door Surround Installation 20-21 Checking Inlet & Outlet pressures 22 Final Installation Check and Initial Operation 23 Lighting Instructions on Rating Plat
57-DVRS50 4 CAUTION & SAFETY FOR YOUR SAFETY - Do not install or operate your Brigantia 57-DVRS50 without reading and understanding this manual. Any installation or operational deviation from this instruction manual voids the Brigantia Industries Warranty and may prove hazardous. This appliance must be installed by a qualified gas installer and the installation must conform to the installation codes. Provide adequate clearance around air openings. Never obstruct front openings.
7-DVRS50 5 APPLIANCE CERTIFICATION This appliance was listed by LABTEST Certification Inc to the following USA and Canadian gas appliance standards. - ANSI Z21.88-2009/CSA 2.33-2009 Vented Gas Fireplace Heaters -CSA P.4.1-09 testing method for measuring annual fireplace efficiency. The listing label is attached to the appliance on the bottom right side of the appliance. A copy is shown on page Please contact Archgard Industries Ltd.
57-DVRS50 Manifold pressure ( min - max)/ Pression d’ad6”W.C.(1.5kPa) - 10” W.C. (2.5 1.6”W.C.(.4 kPa) - 3.5”. W.C. (0.9 kPa) mission kPa) Orifice size-Center/ Dimension de l’orifice #35 DMS (2.77 mm dia.) x 1 #52 DMS (1.63 mm dia.) x 1 Orifice size-Sides/ Dimension de l’orifice #48 DMS (1.93 mm dia.) x 2 #57 DMS (1.09 mm dia.) x 2 Minimum supply pressure (for the purpose of input 5 in. W.C. (1.24 kPa) 11.0 in. W.C. (2.
57-DVRS50 APPLIANCE DIMENSIONS Surround Attached Surround Removed 7
57-DVRS50 8 Framing Dimensions The following section describes the requirements for framing for the model 57-DVRS50. Note: Framing should be constructed as required by local building codes 2 x 6 Framing, opening in framing should be minimum of 66.50”W x 42.00”H.
57-DVRS50 9 Corner Install View Figure 3 Mantle Clearances 20” (504)mm 16” (403)mm Clearance to Combustibles 12” (304)mm Minimum measurements below are from the edge of door (unless otherwise noted). Measured from top of host shell.
57-DVRS50 10 Installation Instructions Figure 5 Stand-off 999-DV-8HTCL
57-DVRS50 11 Installation Instructions Frame opening and cut out hole for the termination and thimble as shown in fig. #6 Figure 6 When installing on an exterior wall you must install the exterior wall insulation board (#57-IB). Place insulation board with the foil facing into the room. Install the wall thimble (as shown below) and seal it and the edges of the insulation board with a good quality silicone sealant to prevent cold drafts.
57-DVRS50 Installation Instructions Cont. 12 Installed fireplace with stand-offs Figure 10 Figure 11 Caulk the outside portion of the vent collar to the fire-stop to prevent cold drafts. Next install the outer portion of the wall thimble and the termination. Figure 12 Note: For installations straight out the back of the 57-DVRS50 the Archgard 999-DV-8HTCL termination is required. The maximum horizontal run straight out the back is 6.00”(no rise).
57-DVRS50 13 Installation Instructions Cont.
57-DVRS50 Installation Instructions Cont. LISTED VENTING SYSTEMS The listed chimney vent systems uses a twist lock connection. Assemble the vent system using the desired combination of sections and elbows for your installation. While assembling the vent pipe, ensure you bear in mind the aesthetic appearance if the venting is visible after installation. Keep seams oriented towards the wall or ceiling where possible.
57-DVRS50 15 Installation Instructions Cont. Figure 22 – Vent Termination Locations Horizontal Installation G. The horizontal run must have a 1/4” rise on an exterior wall and must meet all local and national building codes, and must not be easily blocked or obstructed. Termination clearances are as follows (see Figure 16): Do not install above a meter/regulator assembly within 3 feet (90 cm) horizontally from the centerline of the meter/ regulator.
57-DVRS50 16 Installation Instructions Cont. Vertical Cap Installations Always maintain a 1” clearance around the vent pipe (vertical) and on horizontal venting 2” clearance on the top of the vent, when passing through ceilings, walls, roofs, enclosures, attic rafters or any combustible surfaces. DO NOT PACK AIR SPACES WITH INSULATION. Refer to the vent chart on page 17 for maximum allowable vertical and horizontal allowable installations.
57-DVRS50 17 Installation Instructions Cont. Venting Chart Maximum Total Venting Length 40 Maximum total venting allowed is 50ft. This would be when configured for 40ft vertical with 10ft horizontal. Maximum vertical vent is 40ft. Maximum horizontal vent is 20ft. Minimum 10ft vertical vent rise required for maximum 20ft horizontal vent run. 35 V E R T I C A L V E N T R U N See chart for allowable vent runs.
57-DVRS50 18 GAS CONNECTIONS Before connecting the appliance to the gas supply line, double check that the appliance you have purchased is designed for the gas type you are using. The gas type markings are located on the certification label and also on the appliance’s gas valve. Adequate clearance for proper installation and checking of the gas connections must be provided. All gas connections must be checked for gas leaks.
57-DVRS50 19 Rear Panel Installation Instructions 1. 2. Hang the left and right side back panel onto the bracket in the back of the firebox. Align with the far outside edge of the bracket. Hang the center back panel onto the bracket and slide the two outside panels in until they touch the center panel. Side Panel & Baffle Installation Instructions Set the right and left side panels by inserting the tabs into the slot of the support plate.
57-DVRS50 20 Glass Bead Installation BL AC KG Install the glass beads directly onto the burner so they are one layer deep and cover the entire burner pan. Do not use other media that is not approved by Archgard. LA SS Door Installation Install the top of the door so the slots in the door go over the tabs on the spring clips as shown to the right. Swing door down making sure it sits on top of the unit. CAUTION: Only doors certified with the appliance shall be used.
57-DVRS50 21 Surround Clip Installation Install the four surround retaining clips so they are pushed back against the facing. Secure in place with the screws provided. See right Surround Installation The surround is held in place by clips buttons (two at the top, two at the bottom). Line up the clips with the fireplace and push until it locks in. You can adjust the surround by moving the brackets in and out on the fireplace NOTE: Do not remove any components while the appliance is hot.
57-DVRS50 22 CHECKING INLET AND OUTLET GAS PRESSURE 1. Remove the surround. 2. The pressure test taps are located on the valve. The taps are located in the gas valve front face. The inlet is marked ‘IN’ and the outlet is marked ‘OUT’. 3. Loosen the set screw inside the tap with a screwdriver. 4. Connect a 1/4” (6 mm) rubber tube to the tap post and a manometer. 5. Verify that the readings obtained are within specs (as shown on the appliance rating plate) 6.
57-DVRS50 23 FINAL INSTALLATION CHECK Each Brigantia Gas Fireplace is checked and tested at the factory prior to being packaged and shipped to our dealers and finally installed in your home. Archgard recommends that before leaving this unit with the customer, the installer must ensure that the appliance is firing correctly and that the electrical system is in working order. This will include: 1. Perform leak tests of supply line, gas control valve, supply line from gas control valve and pilot assembly. 2.
57-DVRS50 24 LIGHTING INSTRUCTIONS ON RATING PLATE FOR YOUR SAFETY READ BEFORE LIGHTING Pour votre sécurité Veuillez lire avant d'allumer WARNING: If you do not follow these instructions exactly, a fire of explosion may result causing property damage, personal injury or loss of life. ATTENTION: Si vous ne suivez pas ces instructions à la lettre, un feu d'une explosion entraînant des dommages matériels, des blessures ou la perte de la vie. A.
57-DVRS50 25 FIRST FIRE When operated for the first few times, the appliance will emit some odor and fumes. This is due to the heat from the appliance evaporating the oils and solvents used in fabricating the appliance. Close off the room to the rest of the house and open all windows. Keep the room well ventilated, as smoke alarm may sound. Run the appliance for at least 6 hours at maximum setting to allow paint to cure.
57-DVRS50 26 REMOTE CONTROL SETUP AND OPERATION (future option)
57-DVRS50 27 REMOTE CONTROL SETUP AND OPERATION, cont. * N.A.
57-DVRS50 REMOTE CONTROL SETUP AND OPERATION, cont.
57-DVRS50 REMOTE CONTROL SETUP AND OPERATION, cont.
57-DVRS50 REMOTE CONTROL SETUP AND OPERATION, cont.
57-DVRS50 31 REMOTE CONTROL SETUP AND OPERATION, cont. The unit is shipped from the factory with the ability for IPI/CPI selection active. To disable the Continuous Pilot selection ability, cut one of the wires (blue or white) shown in the picture and cap.
57-DVRS50 REMOTE CONTROL SETUP AND OPERATION, cont.
57-DVRS50 33 CONVERSION KIT INSTRUCTIONS IMPORTANT: This fireplace is Natural gas ready. If converting to LP gas, follow instructions below KIT NUMBER: 57-CKNG for NAT GAS KIT NUMBER: 57-CKLP for LPG Step # 1 - PREPARATION Remove outer surround and door. Place to the side to prevent them from being damaged. Step # 2 - PREPARATION Remove the angled side panels and upper baffle. Remove side panel support plates on each side of the fireplace Step #3 - BURNER REMOVAL Remove the burner media.
57-DVRS50 CONVERSION KIT INSTRUCTIONS, con’t Step # 7 Valve Conversion 34
57-DVRS50 35 CONVERSION KIT INSTRUCTIONS, con’t Step # 8 Complete the Conversion Fill out and attach conversion label to the fireplace near the valve Change Rating Plate to show new fuel configuration Reinstall the burners, support plates and baffle by reversing the removal process. Turn on the gas and electrical supplies. Check for leaks using approved means Confirm correct incoming and manifold pressures Test fire the fireplace to confirm correct operation.
57-DVRS50 36 MAINTENANCE CAUTION: Do not conduct maintenance on the appliance while it is operating or while it is still hot. CLEANING THE APPLIANCE The exterior painted surfaces, glass and plated trims may be cleaned with a soft, non-abrasive cloth and water or a suitable, mild, non-abrasive cleaner. Regularly: Frequent cleaning of the ceramic glass is required. Archgard recommends using a good quality “gas fireplace” glass cleaner that is available at any hearth retail location.
57-DVRS50 37 SERVICING UNDER WARRANTY Before servicing, read the terms and conditions of the Brigantia warranty at the back of the manual. Contact the authorized Brigantia dealer where you purchased the appliance from and provide them with details of the problem, along with the initial installation information (from the front of this manual). WARNING: Servicing of this appliance must be conducted by a qualified service technician.
57-DVRS50 38 WIRING SCHEMATICS Figure 25
57-DVRS50 39 PARTS LIST Item # Item Description Unit 308-6011 SIT PROFLAME II CONTROL MODULE Main control module 308-6012 WIRING HARNESS Main wiring for module 308-6016 WIRING HARNESS SPLIT FLOW Split flow wiring harness 308-6013 BATTERY HOLDER AA Battery holder 308-6014 HANDHELD REMOTE - PROFLAME II Handheld remote control 308-6017 SIT 885 VALVE W/STEP MOTOR Main gas valve 308-6015 SPLIT FLOW VALVE (3/8" NPT) Valve for outside burners 308-6019 PSE SPARK PILOT ASSEMBLY PSE pilot
57-DVRS50 40 FREQUENTLY ASKED QUESTIONS Listed below are some frequently asked questions regarding Brigantia Gas Fireplaces. If you have questions that are not listed below, or are not answered in this manual, please contact your Authorized Brigantia Dealer. Q. My glass has a condensation “fog” when the appliance is first lit. A. Condensation is normal and will disappear in a few minutes after the glass is heated. Q. I have a white “film” on my glass. What is the best way to clean the inside of the glass.
57-DVRS50 NOTES 41
57-DVRS50 42 BRIGANTIA LIMITED WARRANTY This Limited Warranty is made by Archgard Industries, hereinafter referred to as “Brigantia”. Brigantia warrants to the original purchaser of a Brigantia gas burning fireplace (s) that the product will be free of defects in materials and workmanship under normal use and service, for a “lifetime”. INCLUSIONS: “LIFETIME LIMITED WARRANTY“ ( to original purchaser) ❖ All heat exchangers, combustion chamber, burner tubes and pans.
POSTAGE CUT ALONG LINE WARRANTY REGISTRATION ARCHGARD INDUSTRIES 7116 BEATTY DRIVE MISSION, B.C.
ARCHGARD INDUSTRIES 7116 Beatty Drive Mission, B.C. V2V 6B4 Canada Website: www.archgard.