Install Drawing
5 Testing & Troubleshooting
21
5.4 Post-Installation Check List
Now that the compressor installation has been completed, ARB recommends that you take
the time to complete the following check list just to insure that you haven’t missed any of the
vital steps.
The air system has been leak tested.
The air filter position will not be exposed to moisture, dust or dirt.
All air lines and wiring have been securely cable tied to resist snagging.
Switch(es) have been securely mounted within operator reach, yet well away from danger
of accidental engagement.
Switch(es) function properly and illuminate to indicate activation.
INSTALLATION PERFORMED BY:
DATE OF INSTALLATION:
ARB SERIAL No:
______________________________
______________________________
______________________________