Installation Guide
STEP 5 - Wall jamb installation
C
H
Level
Nivel
Pencil
Lápiz
7/16’’
IMPORTANT: Before securing the wall jamb, make sure
you have a wood structure behind your wall. If it is not
the case, we suggest you fix the wall jamb with nylon or
spring toggle bolts or use proper anchor hardware (plug
DD). To ensure a solid wall anchoring
I. Align the wall jamb (C) with the sill edge (H), leaving a
7/16” (11 mm) gab between the latter.
II. Level vertically.
III. Mark holes and side locations with pencil. Remove wall
jamb (C) and drill holes at marked locations.
IV. Insert plastic plug (DD) except for prefab walls.
V. Use screw (CC) to fit the wall jamb in place.
ETAPA 5 - Etapa de junta mural
IMPORTANTE: antes de asegurar la junta mural,
asegúrese de tener una estructura de madera detrás de
la pared. Si no es el caso, le sugerimos que fije la junta
de pared con pernos de palanca de nylon o resorte o
use los accesorios de anclaje adecuados (enchufe DD).
Para asegurar un anclaje sólido a la pared
I. Alinee la jamba de la pared (C) con el borde del umbral (H),
dejando un espacio de 7/16 “(11 mm) entre este último.
II. Nivelar verticalmente
III. Marque los agujeros y las ubicaciones laterales con un
lápiz. Retire la junta de la pared (C) y taladre los agujeros
en las ubicaciones marcadas.
IV. Inserte el tapón de plástico (DD) a excepción de las
paredes prefabricadas.
V. Use un tornillo (CC) para colocar la junta mural en su lugar.
7
CC
DD
C