Specifications

3
SAVE THESE INSTRUCTIONS
INSTALLATION INSTRUCTIONS
WARNING
When using electrical products, basic precautions should always
be followed, including the following:
1. DANGER: RISK OF ELECTRIC SHOCK. Connect only to a circuit
protected by a Ground Fault Circuit Interrupter.
2. Grounding is required. The unit should be installed and grounded by a
qualied service representative.
3. Install to permit access for servicing.
IMPORTANT: Follow the instructions EXACTLY and IN THE ORDER
LISTED. Once installed, your UV unit will provide years of successful
operation.
TABLE OF CONTENTS
0.0 Forward
1.0 Introduction
2.0 Pre-Installation
2.1 Pond Turnover Rates
2.2 Swimming Pool Turnover Rates
3.0 Desired Flow Rate Chart – Swimming Pools, Fountains, Water Features
4.0 Desired Flow Rate Chart – Ponds
5.0 Installation
5.1 Locating The UV Unit
5.2 Plumbing The UV Unit – Plumbing Diagram and Bypass Diagram
5.3 Installing Inlet/Outlet Unions
5.4 Installing Mounting Legs
5.5 Mounting The UV Unit On A Solid Base
5.6 Gluing Piping To The UV Unit
5.7 Electrical Connection
5.8 Electrical Bonding (Grounding)
5.9 Electrical Interlock Of Pump/EA Unit
6.0 Start-up
6.1 Pump Start-up
6.2 Leak Check Total System
6.3 Swimming Pool Chemical Balance
7.0 Maintenance – Quartz Tube Assembly Maintenance/Removal
7.1 Disconnect Power
7.2 Stop Circulation Pump