Installation Guide

5
Lowes.com
ASSEMBLY INSTRUCTIONS
4. Install the cold and hot end valves (J and U):
a. Remove the preassembled
(I) from the top
of the cold end valve (J).
b. From underneath the deck, insert the cold end
valve (J) with the preassembled rubber washer
(K), metal washer (L), and nut (M) through the
hole on the right side.
c. From above, thread the
(I) onto the stem of
the cold end valve (J).
d. Tighten the nut (M) so that the
(I) sits
to the surface of working area.
e. Repeat these steps for the hot end valve (U).
Note: The hot end valve is labeled.
4
L
M
U
J
K
I
5. Install the middle body (P):
a. Remove the preassembled connector (O) from the
middle body (P).
b. From underneath the sink, place the middle body
(P) through the center hole in the deck.
c. Replace the connector (O) back on top of the
middle body (P).
d. Securely tighten the nut (S) with a wrench.
5
P
Q
O
R
S
6. Install the handles:
a. Place the handle bases (G) over the tops of
the cold and hot end valves (J and U) and twist
clockwise to secure.
b. Insert the handles (F) down through the handle
bases (G). Ensure that each handle base is
pointing away from the middle body (P).
c. Secure the handles (F) with handle screws (E)
and tighten with a Phillips screwdriver.
d. Insert the handle caps (D) on top of the handle
screws (E).
6
D
U
P
F
E
G
J