User`s manual

6 CONSHELF XIV USER'S MANUAL
3. PREPARATION AND SET UP
Aqua Lung America, Inc. recommends that you bring your regulator to
an Authorized Aqua Lung Technician for the installation of any accessory
items, including instrumentation, LP quick disconnect hoses and alternate
air sources.
3.1 Mounting the First Stage onto the Cylinder Valve
3.1.1 Yoke Connector
Partially loosen the yoke screw of the rst stage regulator so that the1.
dust cap can be removed from the lter and air inlet.
Remove the protector cap from the cylinder valve.2.
With the cylinder valve facing away from you, release a small amount3.
of air from the cylinder by turning the handwheel counter-clockwise to
open the valve only slightly. When air is heard exiting, immediately close
the valve. This will clear any moisture or debris that may be inside the
cylinder valve outlet opening.
Check the condition of the cylinder valve o-ring.4.
Place the rst stage regulator over the cylinder valve so that the inle5. t
tting aligns with the o-ring of the cylinder valve and the LP hose of the
primary second stage will be routed over the right shoulder. While holding
the rst stage in place, turn the yoke screw clockwise. Ensure that the
yoke screw mates into the small dimple on the backside of the cylinder
valve and tighten nger tight only (Fig 1).
(Fig 1)