Installation Guide
CCK268C
Installation Instructions
We have included instructions for installing each individual component, however
this addendum will cover in more detail how to properly measure and install the
supply line kit included in this combo.
1
Once you have properly identied the
location of the rough out.
Install ½” NPT stub outs protruding
no more than 1-5/8” from the
nished oor, making sure to properly
brace the stub-outs to not allow any
movement as this may cause leaking.
2
Insert escutcheon (FLBELL121)
onto stub-outs, apply Teon tape
to threads.
Thread on straight stop valves
(CC44151X) to stub out.
3







