User and installation manual

QS1 Installation/User Manual
11
4.APsystems Microinverter System Installation
4.3.7 Step 7 - Connect APsystems Microinverters to the PV Modules
Figure 8
When connecting the 1st module, the LED of the microinverter must flash three times
in green. This happens as soon as the cables are plugged in, to show that the
microinverter is working properly. This control function starts and ends within 5
seconds after the device is connected, so pay particular attention to these LEDs when
connecting the DC cables.
Double check to make sure all of the AC and DC wiring has been correctly installed.
Ensure that none of the AC and/or DC wires are pinched or damaged. Make sure that
all of the junction boxes are properly closed.
4.3.8 Step 8 - Complete the APsystems installation map
Fill in the APsystems Registration Cards, which provide system information and the
installation map. Feel free to provide your own layout if a larger or more intricate installation
map is required. The layout map provided is designed to accomodate labels in vertical or
horizontal orientation to meet all the field PV connections.
a. Each APsystems Microinverter has removable serial number labels.
b. Peel labels off, affix one to the respective location on the APsystems installation
map,and fill in 1,2 in the label below,according to the layout on the roof.
c.
After the completion of installation drawings sent to
APsystems website
Figure 9