User's Manual

APsystems ECU-R Installation/User Manual
7
3. Hardware Installation
3.1 Preparation
Make sure you have the following components ready before
beginning to install the ECU-R:
A dedicated standard AC electrical outlet (located as close to the
array as is possible).
A broadband Internet connection available for your use.
A broadband router with either a CAT5 Ethernet, or a wireless
router.
A phone with APP (see page 11).
3.2 Selecting an Installation Location for the ECU-R
Choose a location that is as close to the array as possible
3.3 Installation
1) Using a Wall Mount
When mounting the ECU-R to a wall, make sure to select a cool, dry
indoor location.
Depending on the wall surface you are mounting the ECU-R to, use
either two drywall screws or wall anchors, installed 100 mm apart
(The drywall screws and wall anchors are not included in the ECU-R
kit).
Align and slide the ECU-R onto the mounting screws.
Figure 4