Assembly Instructions
25 / 36
The reproduction, distribution and utilization of this document as well as the communication of its contents
to others without express authorization is prohibited. Offenders will be held liable for the payment of damages.
All rights reserved in the event of the grant of patent, utility model or design.
02.06.2022
Version 1.0
Installation
APS-90-Lite
R
Requirements
ࡇ For the selection of the installation site it is important that the monitored areas of the
individual devices overlap by at least 100 cm or 3.3 (Fig. 19 /1).
ࡇ DNS
+
Service Discovery is available in the network.
ࡇ All devices have activated DNS-SD
+
and SSH.
1
Fig. 19: Overlapping of areas
Installation
To perform a Multi Sensor Fusion proceed as follows:
Installation of all devices
1.
Calculate the position of the devices.
2.
Install the devices.
3.
Configure the devices with the installation height and the pitch and yaw angle.
4.
Configure the floor area of the devices.
5.
Activate DNS-SD and SSH for all devices.
Basi
c
c Configuratio
n
n Fusio
n
n Host
Configuring the host
1.
Configure one device as fusion host.
2.
Scan for client devices.
List of all devices in the network are shown.
3.
Select all client devices.