Specifications
Sequence of Operations – Basic
Install
1. Unit samples for 2 minutes at the end of the
cycle period using it’s internal blower.
2. If measured dewpoint is above the dewpoint
setpoint, the unit will energize the compressor
and blower will continue to run.
3. Dehumidifier will continue to operate until
dewpoint setpoint is reached, at which point
the unit will shut-off.
4. Unit will then sample at the end of the next
cycle period and will run if necessary.










