User guide

9
16-Port 10/100M Fast Ethernet Switch - APPSW16
User Guide
CHAPTER 2. INSTALLATION
2.1 MOUNTING THE SWITCH ON A DESK
To install the Switch, please follow the steps:
1) You can place the Switch on a at table or a vertical wall if you want to
hang the Switch.
2) Please inspect the Power Adapter carefully and make sure that it is pro-
perly connected to a power source.
3) Ensure adequate ventilation space around the switch for dissipating heat
and air.
Note: Please avoid any heavy thing placed on the switch.
2.2 POWER ON
Powering on the Switch, it will automatically initialize and its LED indicators
will respond as follows:
1) All of the Link/Act LED indicators will ash momentarily, which represent
a resetting of the system.
2) The Power LED indicator will light all the time.
Note: If the LED indicators don’t respond as described above, please
check the power supply and its connection.
CHAPTER 3. IDENTIFYING EXTERNAL COMPONENTS
3.1 FRONT PANEL
Figure 3-1 APPSW16 16-Port 10/100M Desktop Switch Front Panel
The Switch’s LEDs are located on the front panel.
• Power LED: This indicator will light up when the Switch powers up.
LEDs (1-16) : One LED indicator will light green when a device is connec-
POWER
1
2
10/100Mbps
3
4
5
6
7
8
9
10
11
12
13
14
15
16
LINK/ACT