9

Table Of Contents
µ
Open the Signature track, and double-click the value shown. Set the Numerator and
Denominator values (and other settings, if desired).
For more information on time signatures, refer to Working with Time and Key Signatures.
Setting the Start and End Points of a Project
A project normally starts at position 1 1 1 1. You can move the project start point to an
earlier position, allowing upbeats or program change commands to be played before the
first downbeat.
To define a projects start point
µ
Drag the project start marker in the Bar ruler to the left or right.
To define a projects end point
Do one of the following:
µ
Drag the project end marker in the Bar ruler to the left or right.
174 Chapter 7 Working with Projects