Specifications
Operation
21
Withdrawal
1. Move the vessel to the place of withdrawal.
2. Mount the EK Siphon.
3. Mount the delivered transfer hose or a relevant filling line.
4. Open the filling/withdrawal valve in order to withdraw liquid
nitrogen.
5. Adjust the desired withdrawal pressure and open
the pressure build-up valve for this purpose.
Caution !
• Observe safety instructions.
• Wear gloves and safety glasses.
• Protect the vessel from rolling away, tumbling down
and damage.
5.5 Withdrawal of liquid Nitrogen










