
SECTION 2 - PROCEDURES
3120855 – JLG Sizzor – 2-21
.
4. Remove end cover assembly (2) and seal ring (4).
Discard seal ring
.
NOTE: Refer to the appropriate “alternate cover construc-
tion” on the exploded view to determine the end
cover construction being serviced.