Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear October 2004
Page 12 of 14 Process Industry Practices
5.17.4 Additional shipping and handling requirements that appear in the individual
equipment specifications shall be strictly adhered to, if applicable.
5.17.5 If the switchgear is shipped in more than one section, each open shipping
split shall be protected with plywood or other approved method.
4.18 Inspection and Testing
4.18.1 The following tests shall be performed:
a. A complete functional and operational test on the wiring, control
devices, relays, and breaker trip and close circuits
b. A dielectric test on the control wiring at 1500 volts minimum and
60 hertz for 1 minute
c. Supplier’s standard routine tests
d. Production tests defined in IEEE C37.20.1 - 2002, Section 6.3. Tests
shall be conducted with all draw-out elements racked in and breakers
closed.
4.18.2 The purchaser shall be notified 2 weeks in advance of testing.
4.18.3 The purchaser or the purchaser’s representative reserves the right to inspect
and observe the tests at the factory.
4.19 Documentation
All drawings and other documents shall be furnished as indicated in Table 1 as a part
of the purchase order.