B. All conduit, junction boxes, conduit supports and hangers shall be concealed in
finished areas and may be exposed in unfinished areas. If construction is ongoing
during this period, measures shall be taken to protect cameras from contamination
and physical damage.
3.02 TEST
The service of a competent, factory-trained engineer or technician authorized by the
manufacturer of the video system shall be provided to technically supervise and
participate during all of the adjustments and tests for the system. All testing shall be
in accordance with the manufacturer instructions.
A. Before energizing the cables and wires, check for correct connections and test for
short circuits, ground faults, continuity, and insulation.
3.03 FINAL INSPECTION
A. At the final inspection, a factory-trained representative of the manufacturer of the
equipment shall demonstrate that the system functions properly in every respect.
3.04 INSTRUCTION
A. Instruction shall be provided as required for operating the system. Hands-on
demonstrations of the operation of all system components and the entire system
including program or set up changes and functions shall be provided.
B. The contractor and/or the systems manufacturer's representatives shall provide a
typewritten "Operational Instruction."
C. Provide 8 hours of instruction at a time convenient to the Owner.