Specifications

PIP ELSAP20 June 2007
Low-Voltage Automatic Transfer Switch
Table 2 – Documentation Requirements
A
With
Bid
B
For
Review
C
Final
Certified
D
As
Built
Description
X X X Detailed bill of materials
X X X X
General layout of equipment, showing all dimensions,
weights, location; outline drawings showing the final
assembled configuration
X X X
Schematic and connection wiring diagrams for all
electrical equipment
X X X Single-line, 3-line, and control schematic diagrams
X List of accessories
X Tabulation of factory settings
X(1)
Installation, operation, programming, and maintenance
manual
X Copies of certified test reports
X Final as-built drawings
X X Recommended spare parts list with pricing
Notes:
A. These documents shall be provided with the proposal.
B. These documents shall be provided for the purchaser’s review and authorization to proceed
before fabrication.
C. These documents shall be provided as part of the final certified document submittal.
(1) Equipment shall be shipped with one set of installation, operation, and maintenance manuals.
D. The final as-built documents shall be provided within 2 weeks following shipment.
Page 10 of 10 Process Industry Practices