Specifications
June 2007 PIP ELSAP20
Low-Voltage Automatic Transfer Switch
4.7.3 If specified on the purchaser’s PIP ELSAP20D Data Sheet, additional testing
shall be performed.
4.7.4 Minimum testing shall include the following:
a. Mechanical operation tests to verify satisfactory operation
b. Electrical function tests to ensure proper operation of all devices and
components
4.8 Shipping
4.8.1 Unless otherwise specified on the purchaser’s PIP ELSAP20D Data Sheet,
preparation for shipment shall be in accordance with supplier’s standards.
4.8.2 Loose equipment shall be appropriately packaged and secured for shipment
inside enclosures or shipping containers.
4.8.3 Loose equipment shall be properly tagged for easy identification.
4.9 Documentation
4.9.1 Documentation Content
4.9.1.1 Drawings and data of the type and quantity shown in Table 2 and the
purchaser’s PIP ELSAP20D Data Sheet shall be submitted.
4.9.1.2 Unless otherwise specified on the purchaser’s PIP ELSAP20D Data
Sheet, drawings shall be provided in approved electronic format.
4.9.1.3 Drawings shall have a space on the right-hand bottom corner for the
purchaser’s title block.
4.9.1.4 A tabulation of factory settings for all adjustable devices in the
automatic transfer switch as shipped shall be provided.
4.9.2 Conflict Resolution
Any conflicts between the reference documents shall be identified in writing
to the purchaser for resolution. If resolving conflicts, the following order of
precedence shall apply:
a. Purchase Order
b. PIP ELSAP20D Data Sheet
c. This Practice, PIP ELSAP20
d. Referenced Standards
Process Industry Practices Page 9 of 10