Specifications
Maxiva ULX Series
November 11, 2013
b‐3
888‐2628‐300 WARNING:Disconnectprimarypowerpriortoservicing.
Copyright©2013,HarrisBroadcast
oneorboth,willnotallowthesolder toflowproperlyforcontinuousadherenceofthesoldertothetwosurfaces
beingsoldered.Aftercleaningandfluxing,acontinuousandevenlydistributedapplicationofheatwithout
overheatingwillresultinanevenlydistributedflowofsolderbetweenthesurfacesbeingsoldered
foraplumbed
systemthatdoesnotleak.Rememberthatsolderflowsfromacoldersurfacetoahottersurfacenomatterthe
orientationofthesurfacesbeingsoldered.
Sinceconsiderableheatisnecessarytomakethesolderflow,sometorchblackandflakingmaydevelopinsidethe
pipe.Beforehangingtheline,itisrecommendedthatahoseandwirebrushorragbeusedtocleanandflushthe
insideofthelinewherepossi ble.Itisalso
recommendedtowashthefluxoffthefinalsolderedjointtoprevent
futuretarnishing.
Note
Keep in mind that an over application of solder can result in solder balls falling in to the associated pip-
ing with the possibility of water flow restriction and/or blockage. Also, an under application of solder can
result in water leakage paths between the common surfaces of the fitting being soldered.
PropaneorMappgasistherecommendedfuelforsolderingcopperplumbingpieces.Thesegassesareavailablein
smallmetallicbottlesthatmatedirectlytoappropriatetorches.Also,a“TurboTo rc h”orequivalentwith
appropriatelysizedregulatorandhosecombinationcanbeusedwithlargergastanks(largecookingstovetank).
If
thesegassourcesarenotavailable,useofacetylenegaswithanacetyleneonlytorchisacceptable.Inanyevent,
onlyskilledplumbingandsolderingpractitioners,knowledgeableofthespecificsolderingequipmentbeingused,
shouldperformtherequiredwork.
Note
A soldering combination of silver bearing solder, i.e. Harris (not Harris Broadcast) Stay-Brite R (086-
0004-038), and “Stay Clean” liquid soldering and tinning flux (086-0004-040) or equivalent, is recom
-
mended. Also, pipe thread joints should be conditioned with Teflon tape (299-0018-000) and a thin film
application of a smooth, non-hardening thread sealing, compound with integrated Teflon is recommended,
i.e. Locktite #565, or “Gasoila” (690-0017-000), prior to mating any two threaded pieces together.
Whenconnectingthreadedplumbingfittings,usealayerofteflontapeandsomepipedopeonthemalefittings.Do
notusepipedopeonthefemalefittingsbecauseitwillbunchupontheinsidesurfaceoftheplumbingandinterfere
withnormalcoolingsystemoperation.Itisdifficult
toremoveexcesspipedopefrominsidethesystem.
Afinalcommentabouttheinstallationprocesscentersaroundtheneedforthedisciplineofpersonnelinand
aroundthecoolingsysteminstallationarea.Undernocircumstancesshouldanyone,coolingsysteminstallerand/or
workersinotherdisciplinesandareas,walkonpipesandfittingsthathaveorhavenotbeenpositioned
and
soldered.Althoughprobablyconvenientforpassagebetweenadjacentworkareas,walkingonalreadysolderedpipe
canandhistoricallyhasledtoprematurelossofsolderjointintegrity,amongotherselfevidentundesirableintegrity
results.
Caution
IF FREEZING CONDITIONS EXIST DURING CHECKOUT AND FLUSHING
PROCEDURES, FLUSHING PROCEDURE AND SUBSEQUENT FILL WITH
FINAL GLYCOL/WATER MUST BE FINISHED BEFORE STILL WATER IS
ALLOWED TO REMAIN IN HEAT EXCHANGER. IF PROCEDURE CANNOT BE
FINISHED, CARE MUST BE TAKEN TO PREVENT WATER FROM FREEZING
IN OUTSIDE COOLING SYSTEM EQUIPMENT. IF WATER REMAINS IN
OUTSIDE EQUIPMENT LONG ENOUGH TO FREEZE, THE UNITS WILL BE
DAMAGED. PUMP A MIXTURE OF GLYCOL/WATER INTO OUTSIDE
EQUIPMENT TO PREVENT DAMAGE.
b.3 Routine System Operation and Maintenance
a. Asageneralruleofthumb,theentiresystemincludingallcabinetsshouldbeinspectedforleaksonarou‐
tinebasis.Andanyindicationofapotentialleaknotedandcorrected.Thetransmittercabinetisequipped
todetectinternalleaks.Fortherestofthesystemplumbing;howeversmall leaks
couldevadedetection.
Ifasystemleak,isdetectedaroundaplumbedsolderjoint,thecoolantshouldbedrained,theleakpointresoldered,
andthesystemrefilledandtested.










